![]() ![]() ”The federal channel was last dredged in 2004 and ongoing sedimentation has created a navigation hazard threatening the economic viability of waterfront industries like Bellingham Cold Storage which rely on a fully maintained channel. ![]() “Maintenance dredging of the Squalicum Waterway is long overdue,” said Bellingham Cold Storage President Doug Thomas. During the works, approximately 254,000 cubic yards of material will be dredged from the waterway and taken by barge to permitted open water disposal sites. of Long Beach, California, for $2.2 million. The USACE awarded the contract to Curtin Maritime Corp. Regular maintenance dredging is required to remove heavy sedimentation deposited from the Nooksack River. ![]() The Squalicum Waterway is critical maritime infrastructure for the regional economy supporting over 2000 jobs and generating hundreds of millions of dollars in gross annual revenue. The project is anticipated to last approximately 45 days. Army Corps of Engineers (USACE), in partnership with local sponsor Port of Bellingham, has started a major waterfront infrastructure project to restore the Squalicum Waterway to its authorized width and depth. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |